I did not get a lot done over the weekend due to having to work Fri night, Sat & Sun once again. But I have made some progress.......here are the most recent updates:
Peach Doily *** Have not even touched in the past 5 days
Triangle Potholder * I have 2 of four triangles now finished
Monkey (1 of 2) ** Finished the body and arms. Hands, Butt, Legs, Feet and tail to go!
Hat *** Worked a few more rounds, still in infancy really
Sideways B-lace Scarf (& the pattern written and posted) * Almost finished!
Crazy Stitch Potholder ** 9 of 15 rounds
Cabbage Patch Bathing Suit * Finished!!!!!!!!
Baby Slippers * One of two done
* = small time required ** = moderate time required *** = large time required
Here is the Cabbage Patch Bathing suit that I made as the first draft for the ones that I am making my nieces......this one will stay with me so I don't have a naked baby sitting my house =)
Actually this is because I used the size hook (G) that the pattern called for, but in the end it was slightly too small on the sides. I used some *gasp* Red Heart that I have in my stash and a pattern from a booklet that was sent to me a while back. I will re-make as it was VERY easy and quick, although with a H hook this time!
I hope that everyone has a great week - I can not say that I'll have tons of time to crochet and knit, but I am going to try very hard to finish a few more things!
Toodles!